Forum · Gallery · Wiki · Shop · Sponsors


Home > Member Galleries > bbyer > FASKIT Air Suspension Installation
Click to view full size image
19mm wiring loom in trough behind bumper and in front of rad
The 19mm wiring loom is large enough that a maximum of six 6mm air lines can be fished thru as required. The loom runs from the FASKIT panel located in the engine compartment behind the left front headlight, down and across in front of the rad and then down to the front axle valve block located behind and below the right fog light.
Rate this file (current rating : 0 / 5 with 1 votes)
Rubbish
Poor
Fair
Good
Excellent
Great

File information

Filename
LR3 19 mm wire loom in space in front of rad 0492.JPG
Rating (1 votes)
File Size
212 KB
Dimensions
1280 x 960 pixels
Displayed
792 times
BBCode
BBCode Full Size