Safari Snorkel Install |
|
TITLE |
+ |
- |
FILE NAME |
+ |
- |
DATE |
+ |
- |
POSITION |
+ |
- |
|
|
Before photo.116 views
|
|
Inlet grill removed127 views
|
|
Template in place to drill holes through guard.149 views
|
|
Bottom of airbox, showing one-way valve and locating lug176 views
|
|
Inside factory air duct - showing felt-like material (used to absorb fumes)152 views
|
|
Factory air duct - showing vinyl covering154 views
|
|
A pillar template in place - ready to drill (through extremely hard metal!)167 views
|
|
A pillar mount pop-rivetted in place and form-a-gasket used to seal underneath162 views
|
|
A pillar mount installed166 views
|
|
Marked inner guard with template to enlarge hole in channel154 views
|
|
Drilled first, then used cut off wheel on Dremel to "join the dots", then painted.151 views
|
|
Half way finished cutting aibox inlet with Dremel - as it was too large to fit the 83mm flexible hose onto it.164 views
|
|
Cut out of inner guard completed - to allow 83mm flexible hose through, as the smaller hole in channel was too small.164 views
|
|
Airbox showing inner inlet tube poking through189 views
|
|
Looking down at jubilee clamp holding flexible hose to airbox inlet.184 views
|
|
Finished the install!255 views
|
|
|