GraemeS
Member Since: 17 Mar 2008
Location: NSW
Posts: 706
|
It will be given a run in 2 D3s and hopefully an RRS too whilst waiting for a batch of looms once the trial loom is proven in my vehicle. I have a few pcbs ready but with only 1 loom initially coming it will have to be moved between vehicles. I'm waiting to order components for at least 25 as soon as I know the loom has been made to my needs and the connectors fit properly.
|
12th May 2010 1:59 pm |
|
|