Dazz360
Member Since: 03 Sep 2016
Location: West Mids Walsall
Posts: 873
|
Sorry to hear it, it’s a gorgeous motor with all the bits you’ve done Metal auto sump & fluid change (3 hrs)
LR door puddle projectors (10 mins)
Tinted Bonnet wind deflector (10 mins)
All Intercooler pipes and Tbolts (2hrs)
3 injectors replaced so far (30mins)
Sunroof drain pipes both sides 2.5 hrs)
Rear discs, shoes,pads,callipers,flexi hoses, rigid brake line, n/s upper hub carrier bush and rear n/s upper arm (13hrs over 2 days)
|
7th Apr 2020 12:13 pm |
|
|
cstarby
Member Since: 19 Dec 2019
Location: Hertfordshire
Posts: 32
|
Thank you, appreciate that.
|
7th Apr 2020 12:24 pm |
|
|